Fleher Bridge
Ort
Düsseldorf, GermanyAnlagentyp
single-pylon central girder cable-stayed bridge (highest pylon in Germany, 146m)Leistungen von ROTEC
- Vibration measurement on all 96 suspension cables
- Determination of the load-bearing capacity
- Magnetic inductive testing of all 96 ropes
- Camera inspection (automated visual inspection) of all 96 ropes
Baujahr
1976-1979Auftraggeber
R. Lange GmbH, Moerson behalf of Straßen.NRW
planner
Gerd Lohmer, Cologne