Home 9 Project 9 Fleher Bridge

Fleher Bridge

Ort

Düsseldorf, Germany

Anlagentyp

single-pylon central girder cable-stayed bridge (highest pylon in Germany, 146m)

Leistungen von ROTEC

  • Vibration measurement on all 96 suspension cables
  • Determination of the load-bearing capacity
  • Magnetic inductive testing of all 96 ropes
  • Camera inspection (automated visual inspection) of all 96 ropes

Baujahr

1976-1979

Hersteller


planner

Gerd Lohmer, Cologne

WordPress plugin development by WordPress agency aceArt.